Important message for WDS users

The IEA has discontinued providing data in the Beyond 2020 format (IVT files and through WDS). Data is now available through the .Stat Data Explorer, which also allows users to export data in Excel and CSV formats.

Replacement of wind turbines

Source: JOIN IEA/IRENA Policy and Measures Database
Last updated: 4 July 2012
Rapid development of wind turbine technology led to a need for replacement of turbines from previous generations of technology. In 2001 a grant scheme for the replacement of old and badly placed wind turbines was introduced. An owner who replaced an old small turbine was granted an additional surcharge of DKK 0.17/kWh for 12 000 full-load hours for a new wind turbine connected to the grid between April 2001 and January 2004. The surcharge was given for a proportion of the capacity of the new turbine corresponding to two to three-times the installed capacity of the decommissioned turbine. Furthermore, the regulation set out that, pursuant of the Electricity Supply Act, the wind turbines would not be guaranteed fixed feed-in tariffs or price surcharges after ten years of operation.