Important message for WDS users

The IEA has discontinued providing data in the Beyond 2020 format (IVT files and through WDS). Data is now available through the .Stat Data Explorer, which also allows users to export data in Excel and CSV formats.

Mandatory EV charging infrastructure in buildings

Source: International Energy Agency
Last updated: 5 November 2019

Non-residential buildings over 500m2 or residential building with more than 10 abitative units starting from the first of January 2018 can receive a building permit only if the project contemplate charging infrastructures for EV. This applies also to buildings undergoing deep renovation.

 

For non-residential buildings each indoor or outdoor parking slot and/or box need to be provided with charging infrastructure. For Residential builsings at least 20% of the parking units and/or box need to be equipped with such infrastructure.

 

The legislative decree 16/12/2016 transpose the European directive 2014/94/EU of the 22nd of October 2014.

Want to know more about this policy ? Learn more (Italian)