Important message for WDS users

The IEA has discontinued providing data in the Beyond 2020 format (IVT files and through WDS). Data is now available through the .Stat Data Explorer, which also allows users to export data in Excel and CSV formats.

Singapore Green Plan 2030

Last updated: 28 June 2024

The Green Plan will help advance Singapore's sustainable development agenda towards achieving net-zero emissions in the second half of the century.

 

Electricity:

  • Increase solar energy capacity at least to 1.5 GWp by 2025 and 2 GWp by 2030
  • 200 MW of energy storage systems deployed beyond 2025 (achieved)
  • Best-in-class generation technology (e.g. new advanced CCGTs) that meets heat rate/emissions standards and reduces carbon emissions
  • Diversify electricity supply with clean electricity imports

 

Greener Infrastructure and Buildings

  • Reduce energy consumption of desalination from 3.5kWh/m3 to 2kWh/m3 by 2025
  • Singapore’s first integrated waste and used water treatment facility to be 100% energy self-sufficient by 2025 (Tuas Nexus)
  • Green 80% of Singapore’s buildings (by Gross Floor Area) by 2030 
  • 80% of new buildings  (by Gross Floor Area) to be Super Low Energy buildings from 2030
  • Best-in-class green buildings with 80% energy efficiency improvement (over 2005 levels) by 2030
  • Reduce public housing energy consumption by 15%

 

Cleaner-energy Vehicles 

  • All new car registrations will be of cleaner-energy models by 2030 and all vehicles to run on cleaner energy by 2040
  • Increase national EV charging points from 28,000 to 60,000 by 2030
  • Replace existing diesel buses with cleaner energy buses by 2040 and electric buses to make up half of the public bus fleet by 2030
  • New registration of diesel cars and taxis to cease from 2025
  • All public housing estates carparks to be equipped with EV chargers by 2025 

 

Transport

  • Achieve 75% mass public transport modal share (i.e. rail and bus) by 2030
  • Expand rail network from to 360km by early 2030s
  • Expand cycling paths to around 1,300 km


Sustainable Aviation

  • All new airside light vehicles, forklifts and tractors at Changi Airport to be electric from 2025
  • All airside vehicles at Changi Airport to run on cleaner energy by 2040

Want to know more about this policy ? Learn more